In 2018, a customer in Malawi selected a JBS40-10-82R diesel concrete mixer pump for a building project of approximately 10 floors. The machine combines concrete mixing and pumping in one unit, helping the customer simplify on-site concrete production and placement.
Project Overview
| Destination | Malawi |
| Equipment | JBS40-10-82R Diesel Concrete Mixer Pump |
| Mixing Capacity | 15 m³/h |
| Pumping Capacity | 40 m³/h |
| Delivery Pipeline | 100 m steel pipe |
| Application | Building construction, approximately 10 floors |
| Service | Remote video installation and commissioning guidance |
Customer Requirement
The customer needed a practical concrete solution for a multi-storey building project. Instead of using separate mixing and pumping equipment, the project required a compact machine that could handle both processes while remaining suitable for local site conditions.

Equipment Solution
The JBS40-10-82R diesel concrete mixer pump was selected for the project. It integrates concrete mixing and pumping functions into one machine, with a mixing capacity of 15 m³/h and a pumping capacity of 40 m³/h. The shipment also included 100 meters of steel delivery pipe for concrete conveying on site.

Installation & Commissioning Support
After the equipment arrived in Malawi, the customer contacted the team for installation and commissioning support. On the same day, the technical team provided remote video guidance for equipment setup, pipeline connection, inspection and commissioning.
The installation and commissioning were completed successfully, and the machine was put into production. The customer appreciated the team’s professional response and efficient technical support.
Project Highlights
- Mixing and pumping functions integrated into one machine
- 15 m³/h mixing capacity and 40 m³/h pumping capacity
- 100 m steel delivery pipeline supplied with the equipment
- Diesel-powered configuration suitable for the project site
- Remote video guidance completed on the day of equipment arrival
- Successful commissioning and start of production
Customer Feedback
The customer was satisfied with the successful commissioning and praised the team for professional and efficient service.
Planning a Similar Project?
Tell us your project location, building height, required concrete output and site conditions. HANZERO can recommend a suitable concrete mixing and pumping solution and provide equipment configuration, pipeline arrangement and technical support.
HANZERO | Building Solutions, Engineering the Future.
[blocksy-content-block id="2047"]